Went down yesterday for an update of the progress and found the walls concrete all settle.

Open concept kitchen in progress. Definately open up our small space. Worry about the grease and stains later. Too bad we cant hack it all the way as HDB require some allowance as seen in the right of the wall.












MBR connection to the WIW area which effecrively is half of the other common room. The other half will be our small study or work area.






The hole from the small study room to the entertainment room. The connection is intended to convert the study room into a small WIW and the entertainment room into a bedroom if we need to house dear's mom in the future.








Our all white floor tiles for the living room and kitchen and the parquet tiles for the rooms.




The cement and sand all up. Figure that the cement sceding will start soon.